They didn't get as much done today as we had hoped, but all of the window wells and door frames are in now. They have also added a horizontal row of rebar at the top of the 3rd level of blocks. Maybe tomorrow they'll get lots of blocks up!
They'll pour the concrete from the top of the blocks with a pump truck. In case anybody was wondering how they get concrete under the windows, check out the last picture below. They have a slot in the bottom parts of all the window wells for the concrete to go through.