Wednesday, July 21, 2010
07-21-2010: Slab and garage poured!
The slab and garage were poured today. The weather stayed overcast and cool most of the day with no rain. It took 8 concrete trucks (about 70 yards), and the guys did a great job. The ICF block guy set rebar in the outer edges of the slab and will start bringing out block tomorrow. He estimates it will take 2 to 3 weeks to stack the blocks for the outer walls and pour the concrete. The ICF blocks are PolySteel brand (http://www.polysteel.com/). It's also Minx's 2nd birthday today!