Wednesday, April 27, 2011

04-27-2011







Rick continues to work on the stair treads going up to the attic.  The plumber was out today and installed the toilets and some drains, etc.  The HVAC guys came out and finished the air conditioning.  I sealed the stair handrails (downstairs) tonight.  We finished tiling and grouting the small utility room in the garage, so the plumber can install the water softener/reverse-osmosis, etc. tomorrow.  The mosaic tile for the backsplash came in a week early, and Rick will pick it up tomorrow morning when he returns the leftover wood, tile and supplies.  The mirror that we picked up yesterday is actually about 1/2" too wide and will have to be returned.  I don't know what we'll do now for a hall bathroom mirror.  I suspect we'll start tiling the kitchen backsplash very soon because a number of projects are waiting on the completion of the tile over the stove area.