Monday, April 25, 2011
04-25-2011: Stair treads, doors/knobs
The HVAC and electrician were both working at times today. The air conditioner and thermostat were installed. The electrician had to wire something for the a/c and also installed the microwave and entry light (I didn't include a picture because we discovered that they had left a major piece off, so it doesn't look right yet). The plumber is finally back in town after two weeks but didn't show up yet.
Rick started cutting and installing stair treads. They were stained last month and will look a lot darker when the sealer is applied. I stained two of the handrails, helped Rick move doors and stair treads in from the shop after the wind finally calmed down, and, with some instructions from Rick, learned how to install door knobs. Randy had put up a few doors this afternoon.