04-16-2011: Tile, day 22
Rick worked on the tile around the tub area today. I helped cut tiles and grouted the floor, benches and some lower walls in the shower. I also cleaned the mortar out of the remaining tiles in the shower in preparation for grouting the rest of the shower.
I made a quick trip in to town this afternoon and picked up the flooring for the back part of the basement. We're using Earthwerks vinyl plank and and are going to attempt to install it tomorrow with the help of some friends if we can rent a 100lb roller. Rick is either going to work on tiling the master bathroom floor or will start installing the hardwood floors. I'm also going to try to get the rest of the master shower grouted and maybe dig the water line from the driveway to the house. Oh yeah, I haven't finished our taxes yet, so I guess I better think about that too.