Saturday, March 19, 2011

03-18-2011: Electrical, day 2

The electrician and helpers were back out today and installed some more lights, etc.  However, his grandfather died today, so they are out until at least Tuesday now.  The bedroom ceiling fan is installed. 

I don't like the entry light--too small and not the right proportions.  Here is a link to the light we will use: http://www.millenniumlighting.com/Product.aspx?id=698   I talked to the saleslady finally this afternoon, and they won't take it back since the wires have been cut.  I figured out a switch we can do with a light in the up-stairwell, so we'll just return the other one (it hasn't been installed yet) and move the current entry light to the stairwell. 

The HVAC guys installed vents and grills today.  The stone guys will be out Monday (ha!).  Rick plans to pour shower pans this weekend, and I'm still thinking about staining the stair treads and rails.
Published with Blogger-droid v1.6.7

No comments: