Tuesday, August 31, 2010
08-31-2010: Doors, windows, plumbing
The windows and doors are in place. It really gives the house a different feel. The plumber finally showed up and put in several vents to the roof. The other framers will be back tomorrow to finish up the front entrance area (Rick picked up the replacement cedar planks today). We are ordering shingles tomorrow. The fireplace will be in by Friday, and that vent also needs to be installed before the shingles go on, but it shouldn't take too long. The HVAC guys have some more work to do and have to install a vent in the roof. We also have to install more vents in the roof for the exhaust fan over the stove and for the dryer vent. It may be early next week before the shingles go up.