Monday, April 21, 2025

4/20/25

 We arrived at different times on Friday. Rick worked on completing the floor repairs. After finishing the kitchen floor, we remembered 4 more holes in the 3rd bedroom closet areas that also needed to be repaired. We had hoped to get the remaining window in the laundry room completed this weekend, but a cold front and day-long rain threat prevented that on Saturday. We removed the door frames for doorways in the original bathroom and all 3 bedrooms (these were all in bad condition and were going to take lots of time--we bought all new door frames and doors to save time and look better), filled in cracks in the floors throughout the house, and pre-sanded some corners and tighter areas in preparation for sanding the floors next weekend. 

On Sunday, we vacuumed dirt from most of the attic and headed back to Lubbock. Rick started on the cabinets last week! This week, Rick will work on the kitchen cabinets in his shop. We'll rent a floor sander and sand (and possibly seal) the floors next weekend. 

Wood for the kitchen cabinets

First cabinet in progress (area including and to left of future kitchen sink)
Future cabinet to be located to right of dishwasher
Large kitchen hole repaired, working on replacing some other bad boards
Last piece
Finished
When we thought we were finished, just remembered these (they've been covered)

Front yard roses are blooming
Neighborhood cat likes the rotten tree house
Repair in progress
Finished (3rd bedroom closet)
Newly created hot water heater closet
Finished
Two holes for pipes in 3rd bedroom (right one already plugged)


Irises on other side of yard are blooming
Different variety
Last look at original bathroom door frame





Floor cracks filled in various rooms



Attic vacuuming: Before (bottom of photo), After (top of photo)
After