It was another Friday-Sunday weekend. The window connector arrived, so we were able to install the front two windows on Friday. It was a little more complicated than a single window but was relatively smooth. Rick also removed the wall furnace from the living room wall.
Saturday, we worked on running electrical plugs, prepping the walls/baseboard areas/windows, and installing sheetrock on exterior walls in the master bedroom. Rick also foamed all of the new windows and put up the exterior trim on the new front windows.
Sunday, we repeated the process for the 2nd bedroom but didn't finish. As is almost always the case, we ran into lots of challenges that slowed us down.
Next weekend, we'll complete exterior wall sheetrock for the 2nd bedroom and begin repeating the process in the living room. We'll also be taping/bedding and possibly texturizing walls in preparation to install the mini-splits for heating. The last window (in the laundry room) has been ordered and should arrive in a few weeks.