We arrived again on Friday morning. We replaced two windows on Friday and one on Saturday. We brought another new window, but it had a defect so we have to return it. Becky and I pulled up the linoleum floor late Saturday afternoon, and I worked on scraping the floor until dark on Saturday night and as long as my arms and neck would hold up on Sunday. I ended up ditching the multi-tool and heat gun and just using a plain scraper. The kitchen floor shouldn't take long to finish next weekend.
Rick got all of the water lines plugged and ready to hook up the water next week. We don't have any inside faucets connected yet but will likely set up a toilet next weekend (yay!). Rick also completed the trim and caulking around the four new windows and worked on the dryer vent and electricity for the dryer, stove, and hot water heater. Next weekend we'll finish the kitchen floor, put in two more windows (south wall of master bedroom and south wall of living room), and work on the water/toilet/electricity/sheetrock/etc.
1 comment:
Lots of sweat and elbow grease have gone into this renovation. It is going to be amazing. Mimi
Post a Comment