The next project was to replace the cellar door and clean out the cellar. I had never been down there before and Rick had been a couple of times. There was no water and no rattlesnakes this time. The old door was in complete disrepair. The new door just needs some trim around the outside sometime, but it seals well and looks much better. We cleaned and swept out the cellar. There are 7 or 8 chairs, some table, and lots of candles. It's actually a fallout shelter from the 1950s.
Sunday, July 26, 2026
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment