Rick was able to go on Wednesday this week, and I arrived Friday morning. He finished the flooring in the closet of the 2nd bathroom, installed both shower doors, put up the over-toilet cabinet in the 2nd bathroom, put down baseboards in the 2nd bathroom and bedroom, finished trimming out the pocket door in the 2nd bathroom, installed the vanity/sink/faucet in the 1st bathroom. We put in the 2nd bathroom toilet, 2nd bathroom mirror, vanity lights in both bathrooms on Friday and then enjoyed burgers, peanut buster bars, and an evening fireworks show at the Jones' house.
Saturday, Rick worked on finishing up the closets in the 3 bedrooms, putting up the remaining trim around the kitchen cabinets, caulking the baseboards and trim, and removing the doors from the laundry room cabinets. I hoed a lot of weeds in the yard, removed everything from the laundry room cabinets, sanded the inside and fronts of the cabinets, and worked on organizing and vacuuming up saw dust.
Sunday, we cleared out the 1st and 2nd bedrooms, vacuumed the floors/windows/baseboards/lower walls, taped the floors and walls around the baseboard and trim, put on 2 coats of paint, and removed all of the tape and paper before leaving.
The bedrooms are now essentially finished except for putting up the ceiling fans and putting the already painted doors back on. The remaining projects include: finish painting the trim & baseboards in the hallway/1st bathroom/3rd bedroom/living room/some in the kitchen, install hot water heater, install ceiling fan in living room, paint touch-ups, install dishwasher (arrives on Monday), install stove, finish painting cabinets in laundry room, paint walls in laundry room, replace floor in laundry room, replace window in laundry room, replace back door, do some re-wiring in the laundry room, light installed in laundry room, and sidewalks done. We're also going to have to figure out a plumbing problem (outside the house).
No comments:
Post a Comment