We had to rent a texture sprayer to get the texture on the walls so decided to arrive Saturday morning and only rent the machine for two days. It went well, and we finished and cleaned up the machine on Saturday. Since everything is taped up for texturing and painting the walls, we were limited on where we could work, so we decided to tackle cleaning and sweeping the attic on Sunday in preparation for blowing insulation into the attic in the future. Thankfully, a cool front came in this morning which kept the attic from heating up too much. I don't ever venture up into the attic or under the house but volunteered to help in order to get it done more quickly. We cleaned out 16-20 five gallon buckets of 80+ years of broken shingles, dirt, etc. It was miserable, but we finished and are very pleased to have unexpectedly completed a large and dreaded project.
Next week, we'll paint the inside of the house and work on some other projects as time allows, such as possibly starting repair work on areas of the wood flooring or continuing to work on electrical rewiring.
No comments:
Post a Comment