We finished the sheetrock in the 2nd bedroom, 2nd bathroom, and hallway. Rick worked on electricity for several areas (we now have a few functioning wall plugs!), electricity under the house for the dryer, plumbing for the hot water heater/washer & dryer/kitchen sink, and secured & tied the washing machine drain into the sewer line. We also pulled down the ceiling tiles in the 3rd bedroom, took a large load of trash to the city dumpster, pulled paneling off of the 3rd bedroom walls, worked on the pantry, and did some planning for windows and walls in the living room, etc. It was about 100 degrees and really hot.