On the weekend of 7/28/24, Rick worked on getting an exterior electrical box installed and I worked on getting ant beds and weeds out of the yard.
The weekend of 8/3/24, we started demolition of the bathroom, hall closets, and bedroom wall/closet. The cast iron tub took Rick 2 full hours to break up with a sledge hammer. It was very hot and uncomfortable. The electricity still wasn't on yet.
Here we're starting to plan for converting one poorly-designed bathroom and two useless hall closets into 2 full bathrooms.
No comments:
Post a Comment