August 23: We have a slab!
Rick is running the power trowel. It was a disaster at first until the concrete set up a little more.
Randy and Tracy spreading the concrete out.
Rickey and Randy filling the footing.
So much for pouring the slab this weekend! This was Saturday afternoon (8/16). We had 2.75" of rain Friday night, and the footing is flooded. There is a good chance of more rain for most of the week..... maybe next weekend if it dries out.
This was August 10th. Rick needs more rebar before he can put down the concrete wire and get ready to pour the slab.
These last 3 were on the weekend of August 2-3.