The slab was poured on 9/6/07.
These 2 pictures were taken on 9/20/07 when the Mueller truck arrived and delivered the building materials.
Saturday, September 22, 2007
Walt and Randy helped all day, and Jim helped set the four main columns. We had to brace everything well before leaving for the day.