Thursday, December 30, 2010

Wednesday, December 29, 2010

12-29-2010: Beams, office doors




We now have beams up in the entry way, dining room, and office.  Rick will work on the spare bedroom tomorrow.  These will all be painted.  He'll then tackle the living room beam which will eventually be stained.  He also installed the office doors yesterday.


Monday, December 27, 2010

12-27-2010





Rick worked more on trim today above the bar and in the bathrooms.  He has also started working on the beam in the front entryway.   The pantry and office doors were delivered too.

Sunday, December 26, 2010

12-26-2010



Rick continues working on trim in the kitchen and bar.  The last picture is a guinea hen that has been drinking out of the temporary koi pond this week. 

Friday, December 24, 2010

12-24-2010

 

Thursday, December 23, 2010

12-23-2010








Published with Blogger-droid v1.6.5

Rick has been working on crown molding in the kitchen and hall.  He'll start putting trim on the tops of the cabinets next.

Wednesday, December 22, 2010

12-22-2010



Tuesday, December 21, 2010

12-21-2010


Published with Blogger-droid v1.6.5

Monday, December 20, 2010

12-20-2010





Rick has finished the kitchen cabinets for now.  He ordered crown molding for the tops of the cabinets and ceilings today.  He also started putting up the vent hood.  I included the original drawing Rick made of the kitchen cabinets and some possibilities for the wood flooring and bathroom tile.

Friday, December 17, 2010

12-17-2010: Kitchen, day 11


Published with Blogger-droid v1.6.5

Thursday, December 16, 2010

12-16-2010: Kitchen, day 10


Published with Blogger-droid v1.6.5

Wednesday, December 15, 2010

12-15-2010: Kitchen, day 9


Published with Blogger-droid v1.6.5

Tuesday, December 14, 2010

12-14-2010: Kitchen, day 8


Published with Blogger-droid v1.6.5

Monday, December 13, 2010

12-13-2010: Kitchen, day 7


Published with Blogger-droid v1.6.5

Sunday, December 12, 2010

12-12-2010: Kitchen, day 6


Published with Blogger-droid v1.6.5

Saturday, December 11, 2010

12-11-2010: Kitchen, day 5



The kitchen cabinet construction continues.  Rick has the bases of the bottom cabinets in place and will work on face frames tomorrow.  We spent a couple of hours looking at tile and hardwood floors today and have it really narrowed down now.

Thursday, December 9, 2010

12-09-2010: Kitchen, day 4


Published with Blogger-droid v1.6.5

Wednesday, December 8, 2010

12-08-2010: Kitchen, day 3



 Rick is cranking out kitchen cabinets!  He has two more upper cabinets going and is working on the face frames tonight.  So far, the kitchen is going much faster than I expected.  Maybe the move-in date isn't quite as far away as we thought......


Tuesday, December 7, 2010

12-07-2010: Stone, day 6 (finished!); Kitchen, day 2








The stone guys finished up just before it got dark tonight.  These guys did an excellent job---they are true craftsmen!  We hope to get them back in a month or two for the fireplace and hearth.   Rick continues his work on the kitchen cabinets.