Sunday, September 22, 2024

9/22/24

It was a fairly successful weekend (and very hot one until Sunday). Rick installed a window in the master bedroom on Thursday. The old windows are high, small, and in poor condition (3' x 3'). We'll upgrade to 3 x 4' windows and will work them in as we can. The hot water heater closet in the 3rd bedroom was framed in, and a new dryer vent area was created.  

On Saturday, we tore out the back of the original master bedroom closet that has the crawl space for under the house and attic access. That area will now be the 3rd bedroom closet. The initial plan was to have a much bigger master bedroom closet that would be the previous desk and closet areas for the 3rd bedroom. We were having a hard time deciding on closet doors--it was a much larger closet area but was narrow and long and the doors presented problems. We decided that since we were going to have to knock out most of the wall anyway for long closet doors and since the room was over 15 ft long, it made more sense to just knock all of it out and make a walk-in closet using a little of the ample room space. We can now make the other (3rd bedroom) closet a little bigger too so that it's easier to access the attic and crawl space.

Rick started setting up the closets today, and I worked on cleaning up and carrying out all of the demo stuff and removing nails and staples from the hardwood floors. 

We also had a large snake visitor (a 6 ft"ish"coach whip, we believe) twice this weekend that is most likely that same one that left his skin in the backyard a month or two ago--not too thrilled about that!






















Sunday, September 15, 2024

9/15/24

 We finished the sheetrock in the 2nd bedroom, 2nd bathroom, and hallway. Rick worked on electricity for several areas (we now have a few functioning wall plugs!), electricity under the house for the dryer, plumbing for the hot water heater/washer & dryer/kitchen sink, and secured & tied the washing machine drain into the sewer line. We also pulled down the ceiling tiles in the 3rd bedroom, took a large load of trash to the city dumpster, pulled paneling off of the 3rd bedroom walls, worked on the pantry, and did some planning for windows and walls in the living room, etc. It was about 100 degrees and really hot. 
















Sunday, September 8, 2024

9/8/24

 We got a lot done this weekend. Rick ran electrical for both bathrooms, installed two bathroom fans, worked on bathroom plumbing, and set both shower basins in mortar before I arrived Friday afternoon. We installed both showers and started putting up sheet rock. We completed sheet rock in the the main bathroom and 2nd bathroom closets and in part of the 2nd bathroom. I also finished tearing out and cleaning up the desk/closet area in the 3rd bedroom on Saturday while Rick was working on the showers.





3rd bedroom closet (original pic)















Monday, September 2, 2024

9/2/24

The weekend was cloudy and much cooler. We worked on plumbing, the bathroom floor, installing 2 showers, sheet-rocking the ceilings of the bathroom, installing a pocket door in one bathroom, lighting placement & electrical.